INDEX
-
House and Grounds Meetings
-
Current open work order items
-
Sprinkler layout
-
Air Condition layout
-
CO2 monitor
-
Fire Lane, Parking Marking
-
Toilet flush
-
Facility Layout Drawing
-
Building Original Construction Year 2000
-
Building Phase 2 Year 2005
-
Audio Visual pre-wire in original 2000 building
-
LED Retrofit program
-
AED
-
Thermostat replacement program
-
Hand Sinks in children’s area
-
Roof leaks Link out to details
-
Lawn Equipment
-
Fire alarm info
-
Baptistry Hot Tub controls
-
Hot water heater
-
Roof service ladder
1. House and Grounds Meetings
H & G Minutes, July 2021 house and grounds agenda
H&G Minutes for 71421
H & G Minutes, Oct 20, 2021 (2)
H & G Minutes, Nov. 17, 2021
Do we have notes from the December H & G meeting?
No Jan 2022 H & G meeting
H & G notes Feb 2022
H & G notes Mar 2022
H and G notes Apr 2022
H and G notes may 2022
H and G notes June 2022
H and G notes July 2022
H and G notes January 2023
H and G notes January 2023
H and G notes April 2023
H and G notes March 2023
House and Grounds Meeting Notes, Mar 6, 2024
2. Current open work order items
Here are the OPEN WORK ORDERS live sheet
3. Sprinkler layout
Church Sprinkler with heads PDF file 11×17
Church Sprinkler with heads 3.pptx
Hunter ICC sprinkler OM_ICC_DOM Hunter controller on the west wall, Key is in the mower shed, or the outside closet
Orbit Weathermaster rain sensor, bad reviews, it is in bypass mode
Issues as of Aug 2022
- 360 degree heads where 180 degree heads should be installed
- Small water leak below head z 12
- One head clogged zone 13
- Head broken
- Clogged head zone 7
- Clogged head
- zone 5 dead, . We cannot find valve.other issues. Rain sense inop.
north island and south island have patterns of dormant grass
here is the link to the water usage Google Sheet
4. Air Condition layout
Here is the link to the Google Sheet for Air Conditioners
Pharris Air – Haley – 214 762 2342
HVAC Technical Junior Morales 817-428-0124
Vendor:
TDIndustries, Denton,
Andy Heramb acct rep 817 304 6009
Tdi call center. Call tdi 800 864 7717
John with TDIndustries scheduler 18172407599
Technician Alex 817 304 6009,
5. CO2 monitor
2 in the kitchen
6. Fire Lane, Parking Marking
7. Toilet flush
Here is the autoflush units installed on each urinal.
BigDIndustriesIncOptimaSmoothAutoFlushUnit
8. Facility Layout Drawing
FBC Justin Facility Drawing With Notes
FBC Justin Facility Drawing With Notes
Other Scans
9. Building Original Construction Year 2000 plans
This was done by Crone Engineering, evidently out of business.
Need scans
Here is the index for the 2001 drawings
IndexDrawing 2001 construction
10. Building Phase 2 Year 2005 plans
Here are the electrical plans from the 2005 expansion.
fbcjustinPlan2005_Mechanical These are the large format prints from the architect:
Henry S Quigg, Richmond Group, 12200, Stemmons #317, Dallas, Texas 75234, Office 972.484.5977, Cell 214.244.8555
12. Audio prewire
Need scan
12. LED Retrofit program
Denton Electric Service, Nathanial knows the GPS timers, wiring. Timothy, Front desk 9403871312
E-Exit signage
South Exterior lights
West exterior lights
4 foot fluorescent in Foyer
Bulb P/N
Tombstone P/N
Notes on exterior light controllers
Notes on the South Lights south GPS light timer installation
13. AED
On charlas desk, batteries are back order.
14. Thermostat replacement program
Removed Honeywell
reset video
Installed SENSI model ST55, Snensi APP for thermostats: u media@fbcjustin.org p Media2737
Wiring notes for wall mounted thermostats
15. Hand sink children’s area
16. Roof leaks
details at http://toddheffley.com/wordpress/?p=11988
17. Lawn Equipment
2 qts 10w-30
Belt.
Zero: 74492 sn 407200497, engine
Push:
Blower Stihl BG86
18 Hot top east parking
18. Fire alarm info.
19. Door locks
19. Baptistry Hot Tub Controls.
Relay Picker PC738-2C-024A0
https://datasheetspdf.com/mobile/1056752/Picker/PC738/
this seems like direct replacement for the topside controller
HydroQuip | BAPTISMAL REMOTE BAPSIDE KIT | 34-0038D25-D HydroQuip $488.67
Coupling for the high level sensor is 400-5640
sensor is called HydroquipAFC2 Baptistry remote
20. Hot water heater
21. Roof service ladder
OSHA seems to get interested in ladders above 24 feet. Ours will be 8ft and 14 ft.
Height requirement: Before these standards were implemented, OSHA ladder fall protection standards applied to those taller than 20 feet. Now, ladders taller than 24 feet are required to follow the ladder fall protection regulations in OSHA standard 1910.23.